• WORKS
  • ABOUT
  • CONTACT
  • BLOG
REALTIME

fold it. 46 tenggiri / seksan design. #malaysia http://t.co/wezjzK5HEK
About 20 hours ago

outside, 46 tenggiri / seksan design. #malaysia http://t.co/cIWr0Vcb2r
May 24th at 10:09pm

yup. 46 tenggiri / seksan design. #malaysia http://t.co/UEN1178tdt
May 24th at 9:38pm

roof trees! 46 tenggiri / seksan design. #malaysia http://t.co/1LU9g1kWsD
May 24th at 9:36pm

rooftop, 46 tenggiri / seksan design. #malaysia http://t.co/pIWfIJbPq0
May 24th at 9:32pm

invisible stair, 46 tenggiri / seksan design. #malaysia http://t.co/KjMK9y29pj
May 24th at 3:35pm

steps, 46 tenggiri / seksan design. #malaysia http://t.co/p6GHcNFiZ4
May 24th at 2:16pm

more concrete, 46 tenggiri / seksan design. #malaysia http://t.co/Q7cn72qwe3
May 24th at 2:05pm

smooth operators. @flightfac http://t.co/okmZWbTDjk
May 24th at 11:31am

a dancing good time. @flightfac http://t.co/2wt7PReZiw
May 24th at 11:28am

  • erich.
    Musical alter ego of James Flaherty.

    Tracks + Mixes.
    DJing, Music, Music Production
    2012
  • CAPITAL
    Part One. The first work in a series focusing on the capital of Australia. Canberra has a huge amount of 'important places' and landmark buildings, the nation this and the nation that.. but how well do we ever take notice of these places?
    Graphic Design, Visual Arts, Digital Imaging
    2012
  • KENT ST v2
    A re-work and re-design of a recent project, aimed at pushing ideas further and producing a more sustainable outcome.

    Rules: The new design must comply to the original client brief and planning guidelines - prefabricated modular construction, all units consist of 2 bedrooms + ensuites, maximum 40% site coverage, compliance with council car parking requirements.
    Problems: The current design requires significant site and construction work after module placement on site [cladding, blade walls, balconies] severely reducing the effectiveness of the prefabricated nature of the project. This also unnecessarily increases costs and construction time.
    Opportunities: What is the maximum that can be incorporated into a module, could it be wholly self sustaining? Could it sustain itself off-grid?
    Architecture, Engineering, Interior Design
    2012
  • BOWDEN COMMUNITY SCHOOL
    The intent of the Bowden Community School is to promote social interaction on a variety of levels. A folded skin wraps the structure facilitating interaction taking place on the level of the students. The next level of interactions is between the school and the community at large as the learning spaces of the school act as one with the courtyards becoming a hive of school wide activity. Steps and slopes provide more places to give different speeds of movement throughout.
    Architecture, Urbanism, Digital Art
    2012
  • DIALECTICAL BRIDGE
    The two cities, or perceptions of the cities, show how different perceptions can create different environments. The residents of zeitgeist and nostalgia live in the same city. It is their perceptions and viewpoints that differentiate between the two cities, these two conditions cannot exist in isolation.

    The bridge does not act in the conventional way, but as there is only one city a conventional bridge should not be required. By only touching one shore the bridge does not reject any one of the two viewpoints. It is because the structure only touches one shore that the bridge can serve as a paradigm of the idea that the past and future are always present within one and any city and that there can be no one city that exists solely on a single perception.
    Architecture, Engineering, Philosophy
    2012
  • BRIDGE REDUX
    In response to a future scenario [2038] for the adelaide CBD the site of the Morphett Street bridge was used as a micro-investigation into the ramifications of the future scenario.
    Aspects included a ban on cars in the CBD along with a highly advanced public transport system compared to the current version.
    The over-arching canopy design removes any fixed spacial order and allows for total flexibility and adaptation for the program over an extended period. New city connections are formed that make the city interact in vertical volumes not just horizontal.
    Architecture, Urbanism, Digital Art
    2012
  • MAELSTROM
    The depiction of a new media centre without static drawings. Movement and journey are the key ideas throughout with a red ribbon of a spine connecting the different elements of the centre.
    Architecture, Video Arts, Music Composition
    2012
  • 8000
    8000 party, 2010.
    Video Arts, Music Composition, Graphic Design
    2012
  • LEGOLOMANIA
    Selected photography works from 2003, originally produced for slides. The third part of a larger series focusing on the reality and result of a post-apocalyptic society.
    Photography, Visual Arts, Photo Manipulation
    2012
FOLLOW ON Bēhance
All works © James Flaherty 2013. Please do not reproduce without the expressed written consent of James Flaherty. Powered by ProSite.